14 单据:Documents:
15 装运条件:Terms of Shipment:
16 品质与数量、重量的异义与索赔:Quality/Quantity Discrepancy and Claim:
17 人力不可抗拒因素:
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。
Force Majeure:
Either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not be predicted, controlled, avoided or overcome by the relative party. However, the party affected by the event of Force Majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence.
18 仲裁:
在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商未能达成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,根据该会仲裁程序暂行规定进行仲裁。该委员会决定是终局的,对双方均有约束力。仲裁费用,除另有规定外,由败诉一方负担。
Arbitration
All disputes arising from the execution of this agreement shall be settled through friendly consultations. In case no settlement can be reached, the case in dispute shall then be submitted to the Foreign Trad Arbitration Commission of the China Council for the Promotion of International Trade for Arbitration in accordance wit
- 【郑重声明】
- 免责声明:成功领袖网登载此文出于传递信息之目的,绝不意味着成功领袖网赞同其观点或证实其描述。以上内容仅供网友学 习与交流,无意侵犯版权。如有侵犯您的利益,请告知。我们将尽快删除。
- 销售最重要的工作:广交朋友
我在印度公司销售工作的经历
电话销售中如何排除客户的异议
做成功销售员必备的10大素质
销售鬼才成功秘诀
销售总监生存的四“输”五“经”法则
电话中的感性销售技巧
销售中不该说的九种话
威尔纳销售课堂:失败是因为不够执著
“刺激”销售人员的“三大绝技”






基本信息